Beaver Mines Utility Services Guidelines

Utility Services Guidelines
Homeowner Connection Guide
Service Connection Application
Pre-qualified Contractors
Quotation Template
 
In accordance with Utility Bylaw 1344-22 Section (6) The Municipal District of Pincher Creek No. 9 (the “MD”) has adopted Utility Services Guidelines (“USG”) to provide clarity and guidance around procedures and requirements owners must comply with during installation of Private Water & Wastewater Lines and prior to activation, specifically within the Hamlet of Beaver Mines. Also Bylaw 1351-24 (Amending Utility Bylaw)
 
The USG's are intended to provide minimum acceptable procedures, requirements, specifications and standards to follow design and install of water and sewer on private properties within The MD of Pincher Creek (MD) when connecting to the municipal Utility Service Water and Wastewater Systems. Service Connections are required to follow and adhere to these guidelines as the acceptable minimum standard.
 
Any work completed on private property by the owners and their contractors are the sole responsibility of the property owner. They are to apply sound design principles and industry best practices to provide an end product that is practical, economical, efficient, safe, and sustainable.
 
Bylaw 1344-22 (Utility Bylaw), Also Bylaw 1351-24 (Amending Utility Bylaw) and its successors regulate and provide for terms, conditions, rates, and charges for the supply and use of Water and Wastewater Services. Where conflicts exist between these guidelines and the Utility Bylaw, the Utility Bylaw shall prevail.
 
Owners must not connect to the curbstops and stubbed sewer connection until the treatment system is able to take flows. The MD will issue an exact date when it is ready to allow final connection to the system. Only the MD and its representatives may turn water curbstops.
 
HOMEOWNER CONNECTION GUIDE

Property owners may refer to the Homeowner Connection Guide for a briefer description of the application and connection process.
 
Property specific site plans will be sent out via mail by the end of June. Copies will also also be obtainable by emailing the MD Office (info@mdpinchercreek.ab.ca) with your property information, or by dropping by the MD office.
 
SERVICE CONNECTION APPLICATION

A service connection application must be completed with a site plan and submitted digitally to admininfra@mdpinchercreek.ab.ca or dropped off in person at the MD office. If additional guidance is required in this process, please refer to the Homeowner Connection Guide as a first step.
 
PRE-QUALIFIED CONTRACTORS

Property owners are recommended to select a pre-qualified contractor, although this is not mandatory. Refer to the pre-qualified contractor webpage for further details regarding this process.

Municipal District of Pincher Creek No. 9
Box 279
1037 Herron Avenue, Pincher Creek, AB T0K 1W0
Phone: 403-627-3130       Fax: 403-627-5070
Email: info@mdpinchercreek.ab.ca
Office Hours: 8:00am - 4:30pm M-F

Municipal District of Pincher Creek No. 9
Box 279
1037 Herron Avenue
Pincher Creek, AB T0K 1W0
Phone: 403-627-3130
Fax: 403-627-5070
Email: info@mdpinchercreek.ab.ca
Office Hours: 8:00am - 4:30pm M-F
Copyright © 2024 MD of Pincher Creek No. 9       Disclaimer